ElectriCare installs Level 2 EV chargers throughout Fullerton. Tesla Wall Connector Preferred Installer, ChargePoint Certified, and licensed electrical contractor (CSLB #778366). We handle permits, panel capacity analysis, and HOA approvals.
Every installation we perform is permitted, inspected, and code-compliant. Skipping a permit risks denied insurance claims, a voided vehicle warranty, and liability when selling your home. If another company offers to skip the permit to save time or money — that is a red flag.
Fullerton's charming neighborhoods feature a mix of early 20th-century Craftsman bungalows and Spanish Colonial Revival homes, particularly in areas near the historic downtown district and along tree-lined streets in the 92833 ZIP code. As more residents transition to electric vehicles, professional EV charger installation has become essential for homeowners seeking convenient overnight charging. Since 2000, ElectriCare has served Fullerton property owners with reliable electrical upgrades, understanding the unique considerations of older homes that may require panel assessments and dedicated circuits. Our technicians perform thorough system inspections to ensure your electrical infrastructure can safely support Level 2 charging equipment, with typical installations ranging from $1,299-$1,600 depending on your specific requirements. We also offer battery storage solutions for homeowners interested in maximizing energy independence and backup power capabilities, providing comprehensive electrical services tailored to Fullerton's distinctive residential architecture.
ElectriCare manages the complete EV charger permit process through the City of Fullerton Building Division, handling all documentation and coordination on your behalf. Our experienced team pulls the necessary permits, submits all required technical documentation, and schedules inspections with city officials to ensure your installation meets local electrical codes and safety standards. All permit costs are included in your installation price of $1,299-$1,600, so there are no hidden fees or surprise charges. This comprehensive service allows you to enjoy a seamless installation experience while we handle the administrative requirements with Fullerton's Building Division.
From Tesla Wall Connectors to panel upgrades, we handle every aspect of your EV charging installation
Tesla Wall Connector Preferred Installer. Hardwired 60-amp circuits for maximum charging speed—up to 44 miles of range per hour.
ChargePoint Certified installer. Adjustable amperage (16A-50A) to match your panel capacity. WiFi connectivity for scheduling.
Upgrade from 100-amp to 200-amp service. Includes SCE coordination, permit, inspection. Federal solar tax credit (30%) applies if bundled with solar.
Budget-friendly option for mobile EV chargers. Code-compliant installation with dedicated 50-amp circuit, permit, and inspection.
Two EVs? We install dual charger setups with load-sharing technology. Both chargers operate simultaneously without exceeding panel capacity.
Pair your charger with rooftop solar to charge with $0 fuel cost. System sized for home consumption and EV charging demand.
Electrical expertise specific to your community's infrastructure
Homes in the hillside Sunny Hills neighborhood often need panel capacity upgrades to support Level 2 EV charging, and we handle the full installation and permit process.
We install Tesla Wall Connectors and Level 2 chargers for homeowners throughout Amerige Heights, a newer master-planned community with modern electrical infrastructure.
In the Raymond Hills area, we provide EV charger installation with careful assessment of older electrical panels common to this established Fullerton neighborhood.
Certified, licensed, and local—serving Fullerton since 2000
We're a Tesla Wall Connector Preferred Installer and ChargePoint Certified installer—two of the most trusted EV charger brands.
Every installation is performed by CSLB-licensed electricians on our payroll—never subcontractors.
ElectriCare pulls the electrical permit, submits load calculations, coordinates the final inspection, and handles utility notifications.
We help navigate HOA architectural reviews and cite California Civil Code § 4745 when needed to ensure approval.
Free electrical panel evaluation to determine if your existing service can handle the charger load or if an upgrade is recommended.
All installations backed by our industry-leading workmanship warranty. We've been licensed in CA since 2000—CSLB #778366.
"ElectriCare installed a Level 2 charger at our home near Fullerton Airport last month. They handled all the permit paperwork with the city and kept me updated throughout the process. The whole job took just under a week from start to finish."
"I needed a panel upgrade before installing my EV charger in the 92833 area. Kevin from ElectriCare explained everything clearly and didn't try to upsell me on things I didn't need. Final cost came in at $1,450 which was fair for the scope of work."
"Really impressed with how clean the crew left our garage after running new conduit for the charger. They showed up on time both days and answered all my questions without making me feel dumb. Would definitely use them again for electrical work."
"We live over near Independence Park and called several contractors before choosing ElectriCare. Daniel was the only one who actually explained why our existing panel could handle the charger load without an expensive upgrade. Installation was done in one afternoon and everything works perfectly."
Most installations in Fullerton homes are completed in 4-6 hours for straightforward setups. If your electrical panel needs an upgrade or the charger location is far from the panel—common in older Fullerton neighborhoods like Sunny Hills—the work may extend to a full day or require a second visit after permit approval.
Many Fullerton homes built before 1990 have 100-amp or 125-amp panels that may need upgrading to safely handle a Level 2 charger. We'll assess your panel's available capacity during the site evaluation and let you know if an upgrade to 200-amps is necessary, which is included in the $1,299-$1,600 installation range when required.
Fullerton requires an electrical permit for EV charger installations, which we handle on your behalf through the city's Building and Safety Division. The permit review typically takes 3-5 business days, and we coordinate the required city inspection once installation is complete to ensure everything meets Fullerton's electrical codes.
Manufacturer warranties typically cover the charger hardware itself (usually 3 years), while our installation work comes with a separate 2-year workmanship warranty. This means you're protected both for equipment defects and any issues related to the electrical installation we perform at your Fullerton home.
Fullerton inspectors verify that installations meet NEC codes and local requirements, and failures are rare when work is done by licensed professionals. If any corrections are needed, we return promptly to address them at no additional cost and schedule the re-inspection with the city to finalize your approval.
Use our free load calculator to find out in two minutes — no electrical knowledge required. It runs the California Electrical Code calculation and tells you exactly where you stand before you commit to anything.
Your minimum required panel size is determined by your total electrical load — not just your panel size alone. The calculator checks this against California code in real time.
Answer a few quick questions below and we'll email your detailed Fullerton EV charger installation quote right away — no waiting for a callback.
ElectriCare handles everything—permits, HOA approvals, panel upgrades, and professional installation by licensed electricians. Get a free quote today.